CMBSC Project Gallery
Current Projects
-
Offloading Trucks
-
Standing columns and building grids
-
Very Constrained Site
-
Start lifting steel grid assemblies
-
Sidewall columns view
-
200' clear rafter spans
-
Joists view
-
Starting 300' span rafters
-
300' clear span rafter
-
Building super truss assembly
-
View looking NW
-
Building supertruss assembly
-
Supertruss rigging
-
Supertruss ready for lift
-
Supertruss lifted, 200,000 lbs
-
Connecting supertruss
-
View across the outdoor practice field
-
View of supertruss from roof
-
Setting grids below the supertruss
-
Erecting roof struture over offices area
-
View looking SW
-
View looking South
-
Donors signing last mainframe
-
Nearing steel erection complete
-
View Inside Looking SW
-
Crew signing the last rafter piece
-
Nelson studs at mezzanine
-
Installing IMP wall East
-
Installing IMP wall North
-
Mezzanine decking
-
Second and third floor mezzanines
-
View SE from over the office mezzanine
-
Crewman offload in Snow
-
Lifting grids
-
Grid in the air
-
Erecting steel
-
Lifts in progress
-
Steel View
-
Connecting assembled grid
-
Second grid airborne
-
Grid building
-
Third grid connecting
-
Connecting odd bays
-
Endwall steel
-
Steel complete
-
Roof started
-
View of roof from underside
-
Roof covering from underside
-
Roofed Underside
-
View of cladding in progress
-
Straight ridge cap
-
Nearly complete
-
Trimming out the buidling
-
setting columns
-
Perimeter set
-
Building wing walls
-
Building wing walls
-
Getting grids ready for lift
-
Grid assembled
-
Ready start
-
Lifting assemblies
-
Connecting grid assembly
-
Connecting rafter gid assembly
-
Tie in the endwall
-
Second grid lifting
-
Connecting second grid
-
Filling in secondary and bracing
-
Steel is up and secure
-
Steel complete, start sheeting
-
Preparing wall for sheets
-
Sidewall Sheeting start